Facebook Google + Twitter LinkedIn

Projects

E14
E14
Plastering and painting in the house. Install new bathroom with seat and concealed lighting. Painting gloss paint wooden surfaces amd varnish step rail.
see details
E14 129
E14 129
Change of water system, elecrical systems and electic box. Change the boiler. Change the PVC door and windows.
see details
E16
E16
Change of water system, elecrical systems and electic box. Change the drain system. Change the boiler.
see details
SE16
SE16
Change electrical systems and electrical box. Remove walls around kitchen for open plan with living room. Building double ceiling and install down light. Install new kitchen.
see details
E15
E15
Refurbishment of two bedrooms, one bathroom and kitchen
see details
HARBOARD
HARBOARD
refurbishment of tree bedrooms flat ,bathroom, toilet, kitchen
see details
Colingoton
Colingoton
Paiting and part tiles bathroom
see details
W9
W9
Plastering and painting one bedroom flat Repalce the bathroom and put bath and shower Repalce the kitchen Painting and clean the balcony Repalce the boiler
see details
Facebook Google + Twitter LinkedIn