SE16


  • Change electrical systems and electrical box.
  • Remove walls around kitchen for open plan with living room.
  • Building double ceiling and install down light.
  • Install new kitchen.
  • Building new water system for additional radiator.
  • Install new shelves in storage place.
  • Bloking fire place.
  • Partition wall for additional bedroom.
  • Remove additional electic radiators.
  • Plastering and painting the house.
  • Bloking windows up the doors.
  • Building double floor in the bathroom and install new additional toilet and basing.
  • Building little double floor in the toilet and change the toilet and install snew basing.
  • Install new wardrobes,beds,cutten.....everything to the key.
  • Painting balcony and entrance area.

Before

SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16

After

SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
SE16
Facebook Google + Twitter LinkedIn