Facebook Google + Twitter LinkedIn

E16


  • Change of water system, elecrical systems and electic box.
  • Change the drain system.
  • Change the boiler.
  • Repair and painting input extension.
  • Blocking an existing door.
  • Open space construction of the arch.
  • Building walls for storage place and creation for additoinal bathroom the old site of kitchen.
  • Bloking fire place.
  • Shift kitchen in extension.
  • Remove old step rail and install new with modern desing.
  • Install new bathroom with change site of the bath,basing and toilet.
  • Bloking second fire place in the bedroom.
  • Plastering and painting in the house.
  • Painting gloss paint on all the wood surfaces.
  • Repair garden fence and clean the garden.
  • Remove existing shed and install new shed.

Before

E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16

After

E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
E16
Facebook Google + Twitter LinkedIn